WithFunded › Working capital › Michigan › Detroit › Concrete contractors
Working capital for Detroit concrete contractors
The best working capital for most Detroit concrete contractors is a business line of credit, because ready-mix suppliers and crews are paid within days of a pour while general contractors pay subcontractors in monthly progress payments. In Michigan no statute sets how fast a private owner or general contractor must pay you, so your lien rights carry the weight: serve a notice of furnishing within 20 days after you first supply labor or materials and record any lien within 90 days after your last work.
By the WithFunded team · Reviewed by Angelo Orru Neto, CFP®, MSc, Managing Partner · Published November 19, 2026 · Detroit rules checked November 19, 2026 · Rates as of November 2026
The short list
- Best for ready-mix and payroll between pours
- Business line of credit
- Best for raising cash from equipment you own
- Equipment sale-leaseback
- Best for a reliable but slow general contractor
- Invoice factoring
- Best for keeping cash out of new equipment
- Equipment loan
See what your Detroit concrete contractor business qualifies for
Answer a few questions in about 2 minutes and get matched to your best-fit option. Zero upfront fees. Checking won't impact your credit.
See what I qualify for →Working as a concrete contractor in Detroit
Registering and pulling permits
A Department of Public Works right-of-way permit, applied for online, before you replace a sidewalk or driveway approach or cut a curb, and a $2,500 surety bond with the City before any right-of-way work. Every sidewalk, drive approach, street, or alley you pour there must have your company's name and the year stamped into each end slab, and no concrete may be placed until the inspector has seen the stamp. (Detroit DPW, Right of Way Permits and Standards)
The Buildings, Safety Engineering and Environmental Department (BSEED) issues building and trade permits through its online eLAPS (Accela) system, where you also upload drawings for plan review. If a permit requires a license, you must first register that license with the City and attach it to your Accela account, and BSEED's Business Systems Support Unit must approve it before you can apply. (BSEED, Getting to the Finish Line in Plan Review (2025))
Where liens are recorded
Construction liens on Detroit property are recorded with the Wayne County Register of Deeds at 400 Monroe St., 7th Floor, in downtown Detroit. Under the fee schedule in effect since January 1, 2026, the office's first increase since 1996, recording a construction lien costs $26 regardless of the number of pages. (Wayne County Register of Deeds, 2026 fee notice)
Working for the city
A 2023 Department of Public Works bid package shows the City's terms: progress payments are due 30 days after the engineer certifies each payment estimate, or on state- or federally funded work 15 days after the City receives that money, and if the City pays late it owes 6% interest when the contractor asks. The City holds 10% retainage until the work is 50% in place and no more after that unless progress is unsatisfactory. (City of Detroit DPW bid package, RFQ 184182 (2023))
Under City Code Section 17-5-12, firms certified by the Civil Rights, Inclusion & Opportunity Department as Detroit-Based, Detroit-Headquartered, Detroit Resident, small, or micro businesses get equalization credits on City bids, including 2% for a Detroit-Based, 5% for a Detroit-Headquartered, and 5% for a Detroit Resident Business. The lowest equalized bidder wins, as long as its price is no more than 12% or $100,000, whichever is less, above the lowest responsible bid. (City of Detroit Equalization Credit Statement (2024))
Other Detroit rules worth knowing
Every employer with a location in Detroit or doing business there, including an out-of-state construction firm working in the city, must withhold City of Detroit income tax: 2.4% for employees who live in Detroit, and 1.2% on the Detroit pay of nonresidents who earn their largest share of pay, and at least 25% of it, in Detroit. Withholding employers file a monthly return (Form 5323) and an annual reconciliation (Form 5321) with the Michigan Department of Treasury. (Michigan Treasury, 2026 City of Detroit Withholding Guide)
On the same 2023 DPW bid, the City required a bid bond of at least 5% of the bid, and performance and payment bonds each worth 25% of the price on City-financed contracts of $50,000 or less, 50% on contracts up to $1 million, and 100% above $1 million or on federally funded work. (City of Detroit DPW bid package, RFQ 184182 (2023))
The City will not award a contract to a firm in arrears on City taxes. A 2025 City sewer repair contract requires income tax and revenue clearances before City Council approval and lets the City, after written notice, deduct delinquent City withholding, corporate, and property taxes from any payment it owes the contractor. (City of Detroit private sewer repair contract (2025))
Under Executive Order 2024-02, Detroit residents must work at least 51% of the hours on City construction contracts over $3 million and on projects with more than $3 million of City funding or help, and the rule binds subcontractors too. A contractor that falls short pays into the City's Workforce Training Fund for each missing hour: 5% of its average hourly wage for the first 10% of the shortfall, 10% for the next 10%, and 15% for the rest. (Executive Order 2024-02, in HRD's 2026 Section 108 NOFA)
Any right-of-way work needs a $2,500 surety bond with the City, filed with the City's Business License Center on the uniform bond form as a "Builder of Artificial Stone Sidewalks" bond. It binds you to keep every sidewalk you build during its term in good repair for five years after completion and to follow DPW's sidewalk specifications. (Detroit DPW right-of-way permit packet (2018))
Demolition needs a City wrecking license in Class A, B, or C. You file a surety bond and a liability certificate with the Law Department, go before the Board of Wrecking Contractors Examiners ($214), pass a written exam ($116), and pay $90 for the license and each renewal; Classes A and B need three years of supervisory experience, while Class C, for houses only, needs five residential demolitions. (BSEED wrecking license application (2024))
BSEED's fee schedule charges $82 for a City electrical contractor license, $37 for an electrical contractor registration, and $22 for a plumbing contractor registration, and a late renewal pays the examination fee on top of the license fee. (BSEED fee schedule (modified July 18, 2025))
Detroit Business Opportunity Program certification costs $250 for firms with under $250,000 of prior-year gross receipts, rising to $2,500 above $5 million, and all documents must be resubmitted each recertification year. A Detroit-Based Business must show a Detroit deed or lease for the previous and current year and its prior-year City business tax return, and a Detroit small business must average under $28 million of receipts in general construction or $12 million in specialty construction. (CRIO, DBOP certification fee schedule and checklist (2024))
What a job ties up in Detroit
Take a $150,000 concrete subcontract billed monthly over four months, on a private job. Each monthly billing is $37,500, and 10% retainage is held back from every billing (Michigan sets no cap on private jobs, so this assumes 10%, a common contract figure).
| Step | Amount |
|---|---|
| Each monthly billing | $37,500 |
| Retainage held from each billing (10%) | $3,750 |
| Paid on each billing | $33,750 |
| Longest wait to be paid on each billing (assumed; see below) | 30 days |
| Interest to carry one billing's $33,750 for those 30 days on a line at 8%–30% APR | $222–$832 |
| Retainage outstanding when your work is done | $15,000 |
| Interest for each month that retainage is carried on a line | $100–$375 |
WithFunded calculation from the Michigan payment rules cited on this page. Michigan sets no private-job payment deadline the example can use, so it assumes 30 days, a common contract term. Actual timing depends on your contract; the work you bill for was paid for in the weeks before you billed it. Interest is simple interest across the representative band. Not a quote.
Michigan payment rules that apply in Detroit
Michigan payment rules at a glance
- Private owner pays prime
- No statutory deadline; the contract sets it
- Contractor pays subs
- No statutory deadline; payments are held in trust for subs
- Public agency pays
- Within 30 days after the engineer certifies the work
- Public retainage
- 10% until the work is 50% in place, then no more
- Lien deadline
- Record within 90 days of last work; subs send a notice within 20 days of first work
- Fast-funding disclosure law
- None enacted
Michigan has no prompt-payment law for private construction: no statute sets how many days a private owner has to pay a contractor or a contractor has to pay its subs, or an interest rate on late payments, so the contract decides. Under the Builders Trust Fund Act, money paid to a contractor or sub is a trust fund for the subs, suppliers, and laborers on that job, and using it for anything else before paying them, with intent to defraud, is a felony. (MCL 570.151, 570.152 (no private prompt-pay statute))
For retainage, lien deadlines, and public-job rules in full, see working capital for Michigan concrete contractors.
The 4 best working capital options, ranked
1. Business line of credit Best for ready-mix and payroll between pours
Ready-mix, rebar, and the crew are paid within days; the general contractor pays monthly, after the owner. A line covers the spread on every pour.
Watch for: Some lenders add draw or maintenance fees, and a limit can be cut at renewal. More on this option →
2. Equipment sale-leaseback Best for raising cash from equipment you own
A contractor who owns pumps, mixers, or forming systems outright can sell them to a funder and lease them back, raising working capital without a new unsecured loan.
Watch for: You turn an asset you own into a monthly payment, so the cash has to earn more than it costs. More on this option →
3. Invoice factoring Best for a reliable but slow general contractor
When a general contractor always pays but takes 60 days, factoring approved billings closes the gap without adding debt to the balance sheet.
Watch for: Your customers pay the factor directly, and with recourse factoring you still carry non-payment risk. More on this option →
4. Equipment loan Best for keeping cash out of new equipment
Financing a new pump or a forming system against its own value keeps your cash and your line for materials and payroll.
Watch for: Older or highly specialized equipment gets shorter terms and higher rates. More on this option →
Side-by-side comparison
| Option | Verdict | Cost basis | Funding speed | Qualifies on |
|---|---|---|---|---|
| Business line of credit | Best for ready-mix and payroll between pours | Representative 8%–30% APR, charged only on what you draw | Often days | Revenue, time in business, and credit |
| Equipment sale-leaseback | Best for raising cash from equipment you own | Lease-style pricing on equipment you already own | Days to weeks | The resale value of equipment you own free and clear |
| Invoice factoring | Best for a reliable but slow general contractor | A factoring fee on invoice value, not an APR | Days | Your customers' creditworthiness more than your own |
| Equipment loan | Best for keeping cash out of new equipment | Representative 8%–30% APR, with the term matched to the equipment's useful life | Days to weeks | The equipment is the collateral, which can offset a thinner credit profile |
What lenders look at
- Your payment record with ready-mix suppliers, who often hold the first claim on an unpaid pour.
- The balance of residential flatwork, which pays quickly, against commercial work, which pays on terms.
- The equipment list: make, age, hours, and what is already financed.
Michigan has not enacted a commercial financing disclosure or merchant cash advance law as of November 2026, so no state rule requires a provider to show you the total cost of an advance before you sign. Michigan's usury law lets banks and credit unions agree in writing to any interest rate on credit to a business, while other lenders may charge no more than 25% a year simple interest. (No Michigan disclosure statute; MCL 438.61, 438.41)
Small business lending in Detroit
The Detroit-Warren-Dearborn metro area had 92,900 mining, logging, and construction jobs in September 2026 (preliminary, not seasonally adjusted), down from 94,200 a year earlier; BLS reports construction together with mining and logging for this metro. (U.S. Bureau of Labor Statistics)
SBA loans, including CAPLines working capital lines, are made by private lenders and guaranteed by the U.S. Small Business Administration. The SBA's Michigan District Office serves the whole state, including Detroit, and can point you to lenders, free counseling, and federal contracting certifications. (SBA) See our SBA loan guide for current rate caps.
Frequently asked questions
- Do I need to register with the City of Detroit if I already hold a Michigan license?
- Usually, yes. If a permit requires a license, you must register it with the City and attach it to your Accela account, and BSEED must approve it before you can apply; registrations renew every year. BSEED's fee schedule lists $46 for residential builders and maintenance and alteration contractors, $22 for plumbing, $23 for mechanical, and $37 for electrical contractor registrations, while an electrical company located in Detroit needs a full City electrical contractor license ($82).
- Do I have to withhold Detroit income tax if my company is based outside the city?
- Yes, if you do business in Detroit. Withhold 2.4% from employees who live in Detroit, and 1.2% on the Detroit pay of nonresidents who earn their largest share of pay, and at least 25% of it, in Detroit. The City also won't award you a contract while you owe City taxes, and its contracts let it deduct delinquent City taxes from what it pays you.
- What does the City of Detroit require of concrete contractors?
- A Department of Public Works right-of-way permit, applied for online, before you replace a sidewalk or driveway approach or cut a curb, and a $2,500 surety bond with the City before any right-of-way work. Every sidewalk, drive approach, street, or alley you pour there must have your company's name and the year stamped into each end slab, and no concrete may be placed until the inspector has seen the stamp.
- How long does a Michigan owner have to pay a contractor?
- On private jobs, no statute sets a deadline or a late-payment interest rate, so the contract decides. On public construction contracts of $30,000 or more, a state or local agency must pay within 30 days after the architect or engineer certifies the work is in place, or 15 days after it receives state or federal funds for the payment, whichever is later, and a contractor paid late may add reasonable interest to its next request. MDOT, school districts, and community colleges are not covered by that law.
- How do concrete contractors pay for ready-mix before they get paid?
- Through supplier credit accounts backed by a line of credit. Suppliers expect payment within their terms, usually 30 days, while a general contractor's progress payment can take longer, so the line covers the overlap.
- Is a sale-leaseback a good idea for a concrete company?
- It can be when cash is tight but equipment is paid off. You get cash now and make lease payments over the term, so the cash should go to work that earns more than the lease costs.
Get matched to working capital for your Detroit business
Answer a few questions in about 2 minutes and get matched to your best-fit option. Zero upfront fees. Checking won't impact your credit.
See what I qualify for →WithFunded has a dedicated page for concrete contractors: concrete.withfunded.com. For financing beyond working capital, see Best business loans for concrete contractors.
What our clients say
Real reviews from business owners funded through Big Think Capital.
ExcellentShowing 5-star reviews of Big Think Capital, our funding partner. TrustScore 4.9 out of 5 on Trustpilot as of November 10, 2026. Read all reviews
How we wrote this guide
The options on this page are types of financing, not individual lenders, ranked by how well each fits the way this trade is paid: first whether its structure matches how long the money is out, then total cost, funding speed, and how hard it is to qualify. The state rules come from the statutes and agency pages linked beside each one. Cost figures are WithFunded calculations at a representative 8%–30% APR band, rates as of November 2026, following our 2026 SMB Financing Cost Report.
WithFunded is a financing marketplace, not a lender. Our 2-minute form suggests a product type from the families we cover, and a funding partner reviews the request. Not every option named here is available through WithFunded; SBA lines, for example, come from SBA lenders.
Sources
- Detroit DPW, Right of Way Permits and Standards
- BSEED, Getting to the Finish Line in Plan Review (2025)
- Wayne County Register of Deeds, 2026 fee notice
- City of Detroit DPW bid package, RFQ 184182 (2023)
- City of Detroit Equalization Credit Statement (2024)
- Michigan Treasury, 2026 City of Detroit Withholding Guide
- City of Detroit private sewer repair contract (2025)
- Executive Order 2024-02, in HRD's 2026 Section 108 NOFA
- Detroit DPW right-of-way permit packet (2018)
- BSEED wrecking license application (2024)
- BSEED fee schedule (modified July 18, 2025)
- CRIO, DBOP certification fee schedule and checklist (2024)
- U.S. Bureau of Labor Statistics
- SBA office serving Detroit
- MCL 570.151, 570.152 (no private prompt-pay statute)
- Mich. S.B. 451 (2023), not enacted; MCL 570.1111
- No Michigan disclosure statute; MCL 438.61, 438.41
More guides for Detroit
Concrete contractors in other Michigan cities
Not legal advice. This page summarizes Michigan statutes as they read on November 19, 2026, for general information. Deadlines depend on the contract, the type of project, and any later amendments. Confirm a deadline with a Michigan construction attorney before you rely on it.
Disclaimer. WithFunded and Big Think Capital are a financing marketplace; we are not the direct lender and do not guarantee funding, approval, rates, or terms. Everything on this page is a representative example only — not an offer or a commitment to lend, and not financial advice. Actual rates, fees, payments, and terms are set by the funding lender and depend on your business, credit, and the product. Where required by state law, the lender provides cost-of-financing disclosures before any agreement is signed.